Latest News on OCCAR-EA

Corporate Document Updates

OMP 6 - Annex A Following approval by the FTPC, the OCCAR standard Articles published as Annex A to OMP 6, Contract Terms and Conditions, have undergone a light revision. They have been amended with an additional article concerning the Handling of Unclassified Sensitive Information plus further clarification on the payment of levies. The amendments are highlighted by a vertical line in the left margin of the documentlink
-------------------------------------------------------
OMP 7 - Issue 3: The Forms and Templates related to the latest version of the OMP 7 are now available under this link

UK/FR Maritime Mine Counter measures - Contract Notice

On 14/05/2012 the Contract Notice N°CO/612/707/PG/18(01) dated 05/04/2012 relating to FR-UK MMCM (MARITIME MINE COUNTER MEASURES)was published.

More information can be found following the link:

A400M - MSN1 makes first refuelling contacts with A330 MRTT

The A400M - MSN1 has successfully performed simulated refuelling contacts with an Airbus Military A330 MRTT Multi Role Tanker Transport.

20th April 2012 - Procurement strategy approved for FR/UK MMCM programme

With the approval of the Procurement Strategy a major milestone for the integration into OCCAR of the FR/UK MMCM programme was achieved Read more

31 March 2012 - Second Italian FREMM launched: Virginio FASAN

On 31st March 2012, another significant FREMM Programme high level objective was achieved. At Riva Trigoso (Genoa) shipyard the Italian frigate “Virginio FASAN” was launched.read more

Airbus Military begins final assembly of second serial A400M

The Airbus Military A400M final assembly line (FAL) in Seville (Spain) has begun working on the second serial production A400M.
Read more

Lynx Helicopter landed on FREMM Frigate

On Tuesday 31st of January and Wednesday 1st of February 2012, the first trials to certify the aviation platform equipment of the French FREMM frigate Aquitaine with French Navy “Lynx helicopter” were conducted in the Atlantic off Lorient.
Read more

Updated "OCCAR at a glance" flyer

The updated "OCCAR at a glance" flyer is now available online. It can be downloaded here Flyer (1kB)

Boxer Programme Division reaches the delivery of the 100th Boxer

The BOXER Programme Division celebrated the delivery of the 100th BOXER on the 20th of January 2012.
Read more

20 January 2012 - The OCCAR-EA Director visited the European Defence Agency

Please click on this link to read more about this visit.

20 December 2011 - First Flight for A400M-MSN006

MSN6 the final development aircraft for the A400M programme took to the skies for the first time today. Read more

TIGER Repair Frame Contract signed

The OCCAR-EA Director signed with Dr. Schley from ECT GmbH this frame contract for the repair of the TIGER helicopter on 07/12/2011 in Bonn.
Read more

First FSAF firing against a ballistic missile

On the 14 November 2011, the French Air Force successfully conducted its first ballistic target firing.Read more

Start of final assembly of the first A400M

Airbus Military has begun final assembly of the first A400M that will be delivered to a customer.Read more

Welcome to OCCAR-EA

Patrick Bellouard
OCCAR-EA Director

Contact:

Godesberger Allee 140
53175 Bonn
Germany

Tel: +49 (0) 228 5502 0
Fax: +49 (0) 228 5502 100

questions@occar.int